Eastport Limited · Cumilla EPZ · Confidential

Inventory, Maintenance
& Procurement Control

Prepared by PentaRox  ·  Enterprise Proposal v1.0

Prepared forEastport Limited
Prepared byPentaRox
Date10 May, 2026
ScopeSingle Factory → Multi-Factory
ClassificationConfidential
Version1.0 — Initial Proposal

Section 01

Executive Summary

Eastport Limited operates a complex manufacturing environment where machine uptime directly drives production output. Yet today, managing spare parts, machine maintenance schedules, needle control compliance, and procurement approvals is fragmented across spreadsheets, WhatsApp messages, and manual records.

What this system delivers
End-to-end control from spare parts requisition to machine repair completion — with full bilingual (English + Bengali) support, mobile QR scanning for mechanics on the floors, needle compliance reports, and real-time dashboards that replace morning status calls.
Outcome How We Deliver It
Eliminate spare part stockoutsMinimum stock alerts, auto-draft POs, usage rate forecasting
Prevent unplanned downtimePM scheduling, downtime risk indicators, part lifecycle alarms
Accelerate procurementStructured PR → Quotation → PI → PO → GRN workflow with approval matrix
Full operational visibilityGM dashboard with live KPIs, downtime risk, and approval queue
Mobile mechanicsMobile app for floors — QR scan, breakdown log, PM completion

N.B: PM = Preventive Maintenance

Section 02

Understanding Your Operations

Before proposing anything, we spent time understanding how Eastport runs. Below is our interpretation of your operations, confirmed through discovery sessions.

2.1 Current Situation

  • 2800+ machines across multiple lines and floors — cutting, sewing (Juki, Brother, Singer), overlocking, pressing, and special-purpose machines
  • 4000+ spare part SKUs managed manually with frequent emergency purchases
  • Emergency POs — a leading indicator of poor stock forecasting
  • Needle control managed via paper registers — manual and time-consuming
  • No real-time visibility for the GM into machine risk, stock levels, or pending approvals
  • Mechanics communicating breakdowns via WhatsApp with no structured job tracking

2.2 What This Costs You Today

Pain PointBusiness Impact
Emergency purchasesEmergency orders run 10–20% above regular price — a measurable cost premium.
Machine downtimeEach unplanned stoppage costs production output, operator idle time, and order delay penalties.
Manual needle recordsRisk of non-compliance gaps due to human error.
No PM systemWithout scheduled maintenance, machines run until failure — the most expensive way to maintain equipment.
Fragmented approvalsPO approval via phone calls and emails has no audit trail and no enforcement of quotation requirements.

Section 03

Proposed Solution

3.1 System Architecture Overview

The Eastport IMPCS is a web-based enterprise application accessible on any device — desktop browsers for item issuers, store operators, managers and GMs, mobile PWA for mechanics on the floors. The system is fully bilingual, designed for users with varying levels of technical comfort.

3.2 Module-by-Module Scope

Module 1: Machine Registry & Maintenance

  • Complete machine register: ID, make, model, location, purchase date, serial number, QR label
  • Preventive maintenance schedule — time-based triggers, auto-alerts when PM is overdue
  • Breakdown logging with photo evidence, root cause classification, downtime timer
  • Machine-level spare parts linkage — which parts does each machine consume, and how fast?
  • Lifetime cost view: purchase + maintenance spend by machine, used to flag replacement candidates
  • QR code labels for every machine — mechanics scan to access full history and log work instantly

Module 2: Inventory / Spare Parts Management

  • Item master with 20,000+ SKU capacity, priority flags (ASAP / Critical / High / Normal)
  • Minimum stock levels with automated alerts and auto-draft PO generation
  • Lifecycle alarm engine: if actual lifespan falls below expected, the system alerts management
  • Repairable item tracking with serial numbers: full repair lifecycle from removal to return
  • Bin location management, category grouping, and item photo support
  • Issue register: every part issued is linked to a machine, mechanic, and job — full traceability

Module 3: Procurement (PR → Quotation → PI → PO → GRN)

  • Purchase Request (PR) module: any authorized user can raise a request; planned or emergency
  • Quotation comparison: side-by-side vendor comparison, minimum 1 quotation (configurable up to 3)
  • Proforma Invoice (PI) attachment before PO generation — enforced by workflow
  • Purchase Order with configurable approval matrix: thresholds by value and factory
  • Granular line-item approval: GM can approve some items and reject others within the same PO
  • Price change flag: any quote above a configurable % from last purchase price is highlighted
  • Goods Receipt Note (GRN): partial receipt support, quantity and quality verification, auto stock update
  • Multi-supplier per PO, multi-currency support

Module 4: Needle Control & Buyer Compliance

This is a direct migration of your existing Needle Issue Management (NIM) — already in production — into the new platform. No re-learning, no data loss. All existing records migrate.
  • Needle issuances register by machine, operator, type, and quantity
  • Broken needle protocol: replacement blocked until all fragments are returned and counted
  • Automated reconciliation: daily mismatch alerts when issued count does not match broken + returned
  • One-click compliance reports formatted for requested and generic audit format
  • Issue history and compliance trend by configured timeframe

Module 5: Reports & Analytics

  • 15 pre-built reports: stock status, price fluctuation, supplier performance, machine cost, PM compliance, needle reconciliation, audit trail, and more
  • Configurable comparison basis for price reports: vs. previous purchase, vs. 3-month average, vs. weighted average
  • Export in Excel, PDF, and CSV from any report
  • AI-based Model Concept Protocol (MCP) integration for power users — interacts with data directly
  • Scheduled reports: daily stock status to Store Manager, weekly KPI summary to GM

Module 6: Role-Based Access Control

RoleKey Access
General ManagerFull dashboard, PO approval authority, all reports
Store ManagerStock management, issue parts, GRN, raise PRs, store-level reporting
Mechanic / TechnicianMobile PWA, log breakdowns and PM, QR scan, request parts
Sourcing / ProcurementManage quotations, suppliers, PI upload, procurement flow
Accounts OfficerValuation reports, price history, payment terms, audit trail
AuditorRead-only access to all records and audit trail

Section 04

Why Choose Us

4.1 We Already Know Eastport & Portwest

We have already built and deployed the Needle Issue Management (NIM) at your facility. We know your floor layout, your approval preferences, your buyer requirements, and your team. Bringing us in for IMPCS means zero learning curve on the client side.

Moreover, we have senior engineers who have served Eastport and Portwest in their career. They have experience working with M3 and one holds a certification from M3 — opening the ground for further connectivity and scale.

4.2 Built for Garments, Not Adapted from Generic ERP

Many vendors offer manufacturing-generic systems that require months of configuration. We have built every feature in this proposal from garments manufacturing requirements: machine lines, needle compliance, cutting floor management, preventive maintenance on sewing machines, and procurement workflows that exactly match how Eastport operates.

4.3 Feature Comparison

FeatureOur SystemTypical Market Alternative
Needle Control (buyer-ready)✓ Built-in, migrated from existing✗ Partial or add-on
Granular PO line-item approval✓ Approve / reject per item✗ Approve full PO only
Lifecycle alarm engine✓ Part-level, machine-level✗ Not available
Mobile PWA for mechanics✓ No app install, QR scanPartial
Bilingual (English + Bengali)✓ Every screen, every role✗ Not available
Price change threshold alerts✓ Configurable per categoryPartial
Repairable item serial tracking✓ Full repair lifecyclePartial
Multi-factory architecture✓ Built in from day one✗ Add-on at extra cost
Metabase reporting✓ Included✗ Custom development needed
Existing system migration✓ Needle control carries over✗ Full re-implementation

Section 05

Implementation Plan

5.1 Phased Approach

Phase 1

MVP

Months 1 – 4

All core modules, data migration, user training. Milestone: 30 days of clean operational data.

Phase 2

Optimization

Months 5 – 6

Bug fixing, module fine-tuning, adapt change requests. Milestone: Bug-free, fully functional modules.

Phase 3

Full Rollout

Months 7 – 8

Advanced reports, accounting integration, mobile enhancements. Milestone: All live, reporting operational.

Phase 3

Scale

Months 8 – 12

Build MCP and interactive intelligence layer for power users. Milestone: Complete interactive functionalities.

5.2 What We Need from You

ItemWhy We Need ItWhen
Hosting decision (cloud / on-premises / hybrid)Determines infrastructure setupWeek 1
Accounting system identificationScope integration requirementsWeek 2
Factory nominationConfigure factory-specific settingsWeek 1
Approval matrix thresholdsConfigure approval workflowWeek 2
Existing needle control user listAccount migration planningWeek 2
Buyer compliance report formatsConfigure export templatesWeek 3
Historical data depth decisionScope data migration effort (risk: 10+ years)Week 3

5.3 Training & Handover

  • Role-specific training sessions: GM view, Store Manager view, Mechanic mobile PWA, Accounts
  • Bengali-language training materials for all operational (floor) roles
  • Feature-wise recorded demo videos for existing and new employee onboarding
  • 30 days of post-go-live support (hyper care period) followed by dedicated support engineers
  • System administrator training for in-house risk mitigation, monitoring and management (RMMM) after handover

Section 06

Open Questions

Before we can finalize the proposal and begin development, we need your input on the following. These decisions shape scope, timeline, and pricing.

#QuestionWhy It Matters
1Which accounting system do you use? Real-time integration or end-of-month file export?Determines integration approach and timeline
2Do you want landed cost tracking for imported spare parts (duty, freight, clearing)?Affects PO and GRN value calculations
3How many years of historical data do you want migrated?Data migration scoping and timeline
4What are your PO approval thresholds by value level?Required to configure the approval matrix correctly
5How strict is the 3-quotation rule? Mandatory for all purchases, or waivable for emergencies?Workflow configuration decision
6What defines an "Emergency" or "ASAP" purchase in your policy?Determines bypass controls in the system

Section 07

Investment Summary

Note on Pricing: Detailed pricing will be provided in a separate commercial proposal following your answers to the open questions in Section 6. The summary below reflects the scope and investment structure — specific figures require hosting model and integration scope confirmation.
ComponentDescriptionModel
Software LicensePerpetual or SaaS subscription (your choice)One-time or annual
ImplementationConfiguration, customization, data migration, trainingFixed-fee project
Needle Control MigrationMigration of existing system + user accountsIncluded in Phase 1
InfrastructureCloud hosting or on-premises server setupPer your hosting decision
Support & MaintenanceBug fixes, updates, SLA-backed helpdeskAnnual contract
Phase 2 ExpansionAdditional factories, cross-factory modulesPer factory
Accounting IntegrationAPI or file-based integrationIncluded in Phase 1

7.1 Return on Investment

10–20%

Cost premium eliminated on emergency purchase orders

40%

Reduction in unplanned downtime events through proactive PM

1-click

Needle compliance reports vs. hours of manual audit prep

<5 days

Procurement cycle time, down from 7+ days

Section 08

Recommended Next Steps

Our recommendation: Schedule a 2-hour working session within the next two weeks. Bring your Store Manager, one factory GM, and your IT head. We will walk through the live demo system together, answer the open questions in Section 6, and have enough to deliver a final scoped proposal with pricing within 5 business days of that session.
  1. Your team reviews this proposal and live demo (demo link shared separately)
  2. Working session: walk through demo, answer Section 6 questions, confirm pilot scope
  3. PentaRox delivers final scoped proposal with pricing within 5 business days
  4. Agreement signed — Phase 1 begins

"We are confident this system will meaningfully change how Portwest operates day to day — giving your people the tools to act on information, not chase it."

Team PentaRox — Eastport IMPCS — May 2026